Select Page

Ms801-4 price made in China - replacement parts - in Lubumbashi Democratic Republic of the Congo 0.55kw IP55 380V 660V Induction AC Motor with top quality

Ms801-4  price tag  created in China - substitute components -  in Lubumbashi Democratic Republic of the Congo  .55kw IP55 380V 660V Induction AC Motor with prime top quality

We - EPG Group the greatest gearbox & motors , couplings and gears factory in China with 5 various branches. For much more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828


Y2 Motor Characteristics

Electric motor body from fifty six - 355, output variety from .17HP to 430HP.Motor mounting variety B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101) Protection sort IP44, IP54, IP55 on ask for .Several mounting arrangement for optional .Aluminum frame, conclude shields and base Strong solid iron body ,Substantial energy cable,Shaft important and protector equipped ,Outstanding paint finish . steel shaft and stainless steel shaft is optional.Electric motor steady obligation S1,motor have vocuum impregnation for insulation, motor is course F insulation and class H insulation is optional.motor has been make according to ISO9001, CE, UL, CCC, GS request All of our merchandise are make according to GOST, RoHS and IEC normal.Large overall performance and IE1, IE2, IE3 effectiveness / IE1 Vitality SAVEING,IE2 - Higher Performance,IE3 Premium Efficiency.

2.Technical specs

one. Silicon metal DR510, 800, 600, 360 regular use stamping of lamination stator and rotor die-casting
2. 100% copper winding and inserting stator (guide and semi-routinely)
3. Stator Vacuum impregnation and drying
four. CNC machining motor shaft, frame, end shields, etc
five. Professional workman inspecting spare areas each processing
6. Electrical motor assembly product line
7. Electrical motor will a hundred% examination just before painting. 
8. Electrical motor spray-paint on motor portray merchandise line
9. Electrical motor will a hundred% verify once more prior to packing. 
An electric motor from materials to end motor, should move fifteen time verify, and one hundred% tests, output power, voltage, electrical existing, non-load, fifty% load, 75% load, one hundred% load and verify the nameplate, packing. Lastly transport to our customer.

three.Specialized Information

TYPE Output Current (A) Pace Eff. Power
Issue
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .eighteen .twenty five .fifty three .fifty 2720 65 .eight five.5 2.2 2.2
Y2E1-632-2 .twenty five .34 .sixty nine .sixty six 2720 sixty eight .eighty one 6.5 two.2 2.2
Y2E1-711-2 .37 .five .99 .94 2740 70 .81 seven 2.2 two.2
Y2E1-712-2 .55 .75 one.forty 1.33 2740 73 .82 seven 2.two two.three
Y2E1-801-2 .75 1 one.eighty three one.seventy four 2830 75 .eighty three seven.five two.2 two.three
Y2E1-802-two one.1 one.five two.58 2.45 2830 seventy seven .eighty four seven.9 two.2 two.3
Y2E1-90S-two one.5 two 3.43 three.26 2840 79 .eighty four 7.5 2.2 2.three
Y2E1-90L-2 2.two three 4.eighty five 4.sixty one 2840 eighty one .85 seven.5 2.2 two.three
Y2E1-100L-2 three 4 six.31 six.00 2870 83 .87 seven.five 2.2 two.three
Y2E1-112M-2 4 five.five 8.12 seven.72 2880 85 .88 seven.five two.two 2.three
Y2E1-132S1-2 five.5 7.five 11.04 10.49 2900 86 .88 7.five two.2 two.3
Y2E1-132S2-2 7.five ten fourteen.88 fourteen.14 2900 87 .88 seven.five 2 2.3
Y2E1-160M1-two 11 15 21.34 twenty.27 2940 88 .89 7.5 two two.3
Y2E1-160M2-2 15 twenty 28.77 27.33 2940 89 .89 7.5 2 two.3
Y2E1-160L-2 eighteen.5 twenty five 34.70 32.ninety seven 2940 ninety .nine 7.five two 2.three
Y2E1-180M-two 22 30 41.27 39.twenty 2940 90 .9 7.5 two 2.2
Y2E1-200L1-2 30 forty 55.53 fifty two.seventy five 2950 ninety one.2 .9 seven.5 two 2.2
Y2E1-200L2-2 37 50 sixty seven.89 sixty four.50 2950 92 .9 7.5 2 two.2
Y2E1-225M-two forty five sixty 82.13 seventy eight.02 2970 ninety two.3 .nine seven.5 2 2.two
Y2E1-250M-2 fifty five 75 99.84 ninety four.85 2970 ninety two.5 .9 seven.five two two.two
Y2E1-280S-two seventy five one hundred 134.98 128.23 2970 93 .nine seven.5 two 2.two
Y2E1-280M-two 90 one hundred twenty five 161.63 153.fifty five 2980 ninety three.eight .9 seven.five 2 two.two
Y2E1-315S-two one hundred ten 150 194.35 184.63 2980 ninety four .91 7.1 1.eight two.two
Y2E1-315M-two 132 180 232.97 221.32 2980 ninety four.five .91 7.one one.eight two.two
Y2E1-315L1-two one hundred sixty 220 278.seventy three 264.seventy nine 2980 ninety four.six .ninety two 7.1 one.eight 2.2
Y2E1-315L2-two 200 270 346.58 329.25 2980 ninety four.8 .ninety two seven.one 1.8 2.2
Y2E1-355M-two 250 340 431.87 410.27 2980 ninety five.3 .92 7.1 one.six two.two
Y2E1-355L-2 315 420 544.fifteen 516.94 2980 ninety five.6 .ninety two seven.1 1.six 2.2
Y2E1-631-four .twelve .16 .forty four .forty two 1310 57 .72 five.2 two.4 two.two
Y2E1-632-four .eighteen .twenty five .sixty two .fifty nine 1310 60 .seventy three 5.2 two.4 2.2
Y2E1-711-4 .25 .34 .79 .seventy five 1330 sixty five .74 five.two two.four two.2
Y2E1-712-4 .37 .5 1.13 one.08 1330 67 .74 five.two two.four 2.2
Y2E1-801-four .fifty five .seventy five 1.fifty five 1.forty seven 1440 seventy one .76 five.7 two.4 2.3
Y2E1-802-four .seventy five 1 two.03 1.ninety three 1440 73 .seventy seven six 2.three two.3
Y2E1-90S-four one.1 one.five 2.89 two.75 1400 75 .77 6 two.3 2.3
Y2E1-90L-4 1.5 two three.70 3.fifty one 1400 seventy eight .79 6 2.three 2.3
Y2E1-100L1-4 2.2 three 5.16 4.ninety 1430 eighty .81 7 two.3 2.three
Y2E1-100L2-4 three four 6.78 6.forty four 1430 82 .eighty two seven 2.3 2.three
Y2E1-112M-4 4 5.5 8.eighty two eight.38 1435 eighty four .eighty two seven 2.three two.three
Y2E1-132S-4 five.five seven.five 11.eighty four eleven.twenty five 1440 85 .eighty three 7 2.3 two.3
Y2E1-132M-4 seven.five 10 15.fifty nine 14.81 1440 87 .eighty four seven two.three two.3
Y2E1-160M-4 eleven 15 22.sixty one 21.forty eight 1470 88 .eighty four seven 2.two two.3
Y2E1-160L-four fifteen twenty 30.13 28.62 1470 89 .eighty five 7 two.two 2.3
Y2-180M-four eighteen.five 25 36.11 34.31 1460 90.five .86 seven 2.2 2.3
Y2-180L-four 22 thirty 42.seventy one forty.fifty eight 1460 91 .86 7.5 2.2 two.three
Y2-200L-4 thirty forty fifty seven.sixty one fifty four.seventy three 1470 92 .86 7.5 two.2 two.three
Y2-225S-four 37 fifty sixty nine.eighty five 66.36 1470 ninety two.5 .87 7.five 2.two two.3
Y2-225M-four 45 sixty 84.68 eighty.45 1470 92.8 .87 7.5 2.2 2.3
Y2-250M-4 fifty five 75 103.28 ninety eight.12 1470 93 .87 seven.two two.two 2.three
Y2-280S-4 75 100 139.64 132.sixty five 1480 93.eight .87 seven.two two.two two.three
Y2-280M-4 90 a hundred twenty five 166.85 158.fifty one 1480 94.two .87 seven.two two.2 2.3
Y2-315S-4 a hundred and ten one hundred fifty two hundred.97 190.92 1480 ninety four.five .88 seven.2 2.two 2.three
Y2-315M-4 132 180 240.40 228.38 1485 94.eight .88 7.two 2.1 2.3
Y2-315L1-4 160 220 291.09 276.54 1485 ninety four.nine .88 6.nine two.one 2.three
Y2-315L2-4 200 270 359.forty 341.forty three 1485 95 .89 6.9 two.1 two.three
Y2-355M-4 250 340 442.85 420.71 1490 95.three .nine 6.9 2.1 2.two
Y2-355L-four 315 420 556.24 528.forty three 1485 95.six .nine 6.9 two.1 2.two
Y2E1-711-six .18 .twenty five .seventy four .70 850 56 .sixty six 4 one.9 2
Y2E1-712-six .twenty five .34 .ninety five .ninety 850 fifty nine .68 four one.nine 2
Y2E1-801-six .37 .5 one.30 1.23 890 62 .seven four.7 1.nine two
Y2E1-802-six .fifty five .75 1.seventy nine 1.70 890 65 .seventy two 4.7 one.nine 2
Y2E1-90S-six .seventy five one two.eighteen 2.07 910 72.seven .seventy two five.5 2 two.1
Y2E1-90L-six one.1 1.five 3.01 two.86 910 76 .73 five.5 2 2.one
Y2E1-100L-6 1.five 2 3.85 3.65 940 79 .75 5.five 2 two.1
Y2E1-112M-six 2.2 3 five.43 five.16 940 81 .seventy six six.five two 2.1
Y2E1-132S-6 three four seven.31 six.ninety five 960 82 .76 6.5 2.one 2.one
Y2E1-132M1-6 4 5.5 nine.fifty two nine.04 960 eighty four .seventy six six.5 2.1 2.1
Y2E1-132M2-six 5.five 7.5 12.62 11.99 960 86 .77 six.five 2.1 2.1
Y2E1-160M-6 7.5 ten sixteen.ninety one 16.07 970 87.5 .seventy seven six.5 2 2.one
Y2E1-160L-six eleven fifteen 23.eighteen 22.02 970 89 .eighty one 6.five 2 two.1
Y2E1-180L-6 15 twenty 31.26 29.70 980 90 .81 six.5 2.1 two
Y2E1-200L1-6 eighteen.five 25 37.63 35.seventy five 980 90 .83 six.five 2.1 two
Y2E1-200L2-six 22 thirty forty three.25 forty one.09 980 92 .eighty four 7 two.1 2
Y2E1-225M-six 30 forty 57.30 54.forty three 980 ninety two.5 .86 7 two.1 2
Y2E1-250M-6 37 50 70.44 66.92 980 ninety two.8 .86 seven two two
Y2E1-280S-6 forty five sixty 85.03 eighty.78 990 93.five .86 seven 2 2
Y2E1-280M-six 55 75 103.59 98.forty one 990 ninety three.eight .86 7 2 2
Y2E1-315S-six 75 100 139.34 132.37 990 ninety four .87 6.7 two 2
Y2E1-315M-six ninety 125 168.seventy nine a hundred and sixty.35 990 ninety four.2 .86 six.7 2 two
Y2E1-315L1-six 110 a hundred and fifty 200.97 190.ninety two 990 94.five .88 six.7 two 2
Y2E1-315L2-six 132 180 240.66 228.62 990 94.7 .88 six.7 one.9 2
Y2E1-355M1-6 160 220 292.01 277.forty one 990 94.6 .88 six.seven one.nine two
Y2E1-355M2-six 200 270 363.86 345.sixty seven 990 94.nine .88 six.7 1.nine two

Why us? 
 

1.Lower MOQ: It can fulfill your promotional business extremely effectively.
  
2.Very good Services : We take care of consumers as buddies,providing 24 hrs a days 7days a 7 days provider assist.

 three.Very good High quality :We have strict top quality manage system.Good reputation in the market.
 
4.Fast & Cheap Delivery: We have big price reduction from forwarder.

FAQ

Q: Do you supply OEM support?

A: Yes 

Q: What is your payment phrase?

A: 30% T/T in progress, 70% stability when getting B/L duplicate.  Or irrevocable L/C.

Q: What is your direct time?

A: About thirty days right after obtaining deposit or first L/C.

The use of first equipment manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating product use and compatibility. Our organization and the shown substitution components contained herein are not sponsored, accepted, or made by the OEM.

Ms801-4  price  produced in China - replacement areas -  in Lubumbashi Democratic Republic of the Congo  .55kw IP55 380V 660V Induction AC Motor with leading good quality

Ms801-4  price  created in China - replacement components -  in Lubumbashi Democratic Republic of the Congo  .55kw IP55 380V 660V Induction AC Motor with prime top quality

shaft car

As one of leading shaft car manufacturers, suppliers and exporters of products, We offer shaft car and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of shaft car

Recent Posts